The functions in this section address the managing of work packages, Technical Design Reports (TDRs) for these work packages and project planning data for these work packages.
Returns a list of work packages. Specific work packages can be selected and edited.
A specific work package can be selected and edited.
A new work package can be added to the database.
This section covers the managing of the Technical Design Reports (TDRs) for the project. The TDRs themselves are stored along with other technical documentations in the EDMS database. PAW contains links to these documents.
Returns a list of all TDRs. A specific TDR can be selected and edited.
This menu allows for editing the information stored for a given TDR.
Opens a form to add a new TDR to the database.
Returns a table with the statiscs of Technical Design Reports (TDRs) for a selected system/subsystem. This statistic includes the numbers of TDRs that have been approved, have been submitted or will be submitted.
This section yields reports on the milestones for the work packages of the project.
Lists all milestones for a selected system/subsystem.
Based on outdated MS-Project data. Must be transitioned to Planisware.
Lists all milestones belonging to a selected work package.
Based on outdated MS-Project data. Must be transitioned to Planisware.
Specific types of selected milestones (for example M4) are listed.
Based on outdated MS-Project data. Must be transitioned to Planisware data.
Shows a list of milestones that are deviating from the baseline.
Based on outdated MS-Project data. Must be transitioned to Planisware data.
Returns a list of critical milestones for a chosen system/subsystem.
The database is currently working with old MS-Project data. Must be transitioned to Planisware data.
Draws a progress curve (s-curve) based on the selection criteria and for the selected system.
Plot is currently based on old MS-Project data. Must be transitioned to Planisware data.